The control panel project cycle

  1. Consult and design
  2. Build and program
  3. Test and commission
  4. Support

Design based on project requirements

A PLC panel is part of an industrial process control system. Its design begins with understanding the equipment, signals and process operating logic. Arya Ravesh Mahshahr provides design, manufacturing and commissioning services for these panels.

Coordinating hardware and software

The processor, input/output modules, network and wiring must match the control logic. Reviewing these connections during design and testing helps identify operating errors before the system enters service.

INSIDE A CONTROL PANEL
PSU
Power supply
CPU
Processor
DI / DO
Digital input / output
AI / AO
Analog input / output
Schematic view of control panel components

PLC panel services at Arya Ravesh Mahshahr

  • Basic and detailed engineering of control panels
  • Development of a control philosophy suited to the client’s process
  • PLC programming and control logic development
  • Specialist advice on control philosophy and hardware selection
  • System configuration design, including modules, networks and communications
  • Panel layout drawings and electrical schematics
  • Signal lists and input/output (I/O) lists
  • Cable lists and required instrumentation lists
  • Panel assembly and wiring in accordance with applicable industrial standards
  • Factory acceptance testing (FAT) before dispatch
  • Site acceptance testing (SAT)
  • Installation, termination and commissioning
  • Maintenance and technical support after commissioning
PLC layout, modules and wiring inside the panel
PLC layout, modules and wiring inside the panel

Manufacturing, assembly and programming

Design, assembly, wiring and PLC programming at Arya Ravesh Mahshahr are supervised by the technical team. Coordinating these stages makes it easier to align circuits with the control logic.

The application, technical requirements, budget and operating conditions are considered when selecting equipment brands and models.

Control system design and programming
Control system design and programming
FROM DESIGN TO OPERATION
  1. Design

    Control philosophy, I/O lists and drawings

  2. Build and program

    Assembly, wiring and PLC logic

  3. Factory testing

    FAT · before panel dispatch

  4. Site testing

    SAT · verification at the installation site

  5. Commission and support

    Commissioning, maintenance and technical services

Control panel project stages

Project documentation and tests

Drawings and equipment lists provide the basis for panel construction and inspection. Factory acceptance testing (FAT) takes place before dispatch, and site acceptance testing (SAT) after installation. Test scope and acceptance criteria are determined by project requirements.

Computer work beside a control panel
Computer work beside a control panel

Estimation and support

Technical requirements, cost and execution time are reviewed before work begins. A technical site visit is arranged when needed. The company’s services also include support after commissioning.